Bilge before paint!
Bilge After paint!
While painting the bilge I noticed some water weeping out of the floor between the galley and nav station. I cut out a small section and was surprised to see more foam. I decided to cut out the section and found it was saturated. I let the area sit for a few days to dry and am in the process of glassing and sealing to reinforce the area.
New Cabin Sole in place
Inside shed April 20, 2013. 2 feet of snow outside .
Cabin sole before!